Construction Technology Process of Breathable freely
plastic runway
1、In order to ensure bottom coating's perviousness, we should avoid
construction in a condition of burning sun or under higher
temperature(>**0℃). If there is dew on the morning, it is not
fit for construction too. Anyway the base surface should be dry
before construction.
2、To clean the base surface, and do waterproof treatment to
concrete surface after the surface totally drying. Using a roller
to paint a layer of waterproof material. The recommended coverage
per square is 0.2KG.The surface curing time is *4 hours.
3、After finishing solidifying, we prepare the high elasticity black
colloidal particles with particle size of **4mm, mixed with high
strength PU single glue. And the recommended proportion of those is
1:8. Then after mixing well, we pour them into pover. The laying
thickness is ***0mm. And the recommended dosage of particles per
square is 8KG, with 1KG glue per square. The solidity time is *4
hours.
4、The proportion of finishing paint A material on runway and B
material is 1:3. And mixing them well for following use. Then
mixing EPDM with particle size of **2mm and finishing paint well,
with proportion of 1:1, then pour them into paver. Let spray gun's
angle keep *0 degree for spraying. After finishing spraying, we
need *4hour for solidifying&maintenance. Spraying the runway in
the opposite direction again. The recommended dosage of finishing
paint is 1.2kg per square, EPDM particles are 1.1kg per square, the
catalyst is 0.**2kg per square, then it still needs *4 hours
to solidify.
5、 After finishing for *4hours solidifying&maintenance, we can
mark line on the ground, and the marking paint is 0.*1kg per
square.
6、Finishing construction of all progress, after 7days for
maintenance for the runway, we can put it into use.