看起來你不是TradeKey.com的會員。 立即註冊,與全球超過7百萬的進口商和出口商建立聯繫。 点击注册--免费! |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
breathable freely plastic runway breathable freely plastic runway breathable freely plastic runway breathable freely plastic runway
Next

breathable freely plastic runway

离岸价格

获取最新报价

|

- Minimum Order

国家:

China

型号:

-

离岸价格:

获取最新报价

位置:

-

最小订单价格:

-

最小订单:

-

包装细节:

under customer's requirement

交货时间:

-

供应能力:

-

付款方式:

-

產品組 :

-

现在联系
免费会员

联系人 Ms. Olivia

Han Kow north Road, Wuhan, Hubei

现在联系

产品规格

详情

 

Construction Technology Process of Breathable freely plastic runway



1、In order to ensure bottom coating's perviousness, we should avoid construction in a condition of burning sun or under higher temperature(>**0℃). If there is dew on the morning, it is not fit for construction too. Anyway the base surface should be dry before construction.

2、To clean the base surface, and do waterproof treatment to concrete surface after the surface totally drying. Using a roller to paint a layer of waterproof material. The recommended coverage per square is 0.2KG.The surface curing time is *4 hours.

3、After finishing solidifying, we prepare the high elasticity black colloidal particles with particle size of **4mm, mixed with high strength PU single glue. And the recommended proportion of those is 1:8. Then after mixing well, we pour them into pover. The laying thickness is ***0mm. And the recommended dosage of particles per square is 8KG, with 1KG glue per square. The solidity time is *4 hours.

4、The proportion of finishing paint A material on runway and B material is 1:3. And mixing them well for following use. Then mixing EPDM with particle size of **2mm and finishing paint well, with proportion of 1:1, then pour them into paver. Let spray gun's angle keep *0 degree for spraying. After finishing spraying, we need *4hour for solidifying&maintenance. Spraying the runway in the opposite direction again. The recommended dosage of finishing paint is 1.2kg per square, EPDM particles are 1.1kg per square, the catalyst is  0.**2kg per square, then it still needs *4 hours to solidify.

5、 After finishing for *4hours solidifying&maintenance, we can mark line on the ground, and the marking paint is 0.*1kg per square.

6、Finishing construction of all progress, after 7days for maintenance for the runway, we can put it into use.

 

国家: China
型号: -
离岸价格: 获取最新报价
位置: -
最小订单价格: -
最小订单: -
包装细节: under customer's requirement
交货时间: -
供应能力: -
付款方式: -
產品組 : -

Send a direct inquiry to this supplier

至:

Ms. Olivia < GUANGZHOU GREENWALK SPORTS PLASTIC MATERIAL CO., LTD. >

我想知道: